Calculate and explain added value

Calculate the value added between a product's selling price and the cost of bought-in materials or components.

Understanding business activity · Cambridge IGCSE Business 0264 · 1.1

Cambridge IGCSE Business 0264, 2027–2029 syllabus, Topic 1. Apply concepts to the stated business and weigh benefits against costs and stakeholder effects. Written practice is self-checked and does not certify exam readiness

Before you begin

  • No previous business study is assumed. Read each scenario for the decision-maker, objective, available evidence and constraints.

Work on paper. Try each question before revealing help, and explain why your method works.

Quick readiness check

How is added value per unit calculated?

What you will learn

  • Calculate added value per unit
  • Distinguish added value from profit
  • Explain ways a business may increase added value

Use the syllabus relationship

Added value per unit = selling price − cost of bought-in materials or components. The comparison asks how much value the business adds beyond those purchased inputs.

If materials cost $2.40 and the product sells for $6.00, added value is $3.60 per unit. Keep units and currency clear, and check that the subtraction uses the correct bought-in cost.

Added value is not profit

Wages, rent, energy, finance and other costs may still need to be paid. Positive added value does not prove that the business makes a profit.

Design, quality, convenience, branding or processing may support a higher selling price, but customers must value the change and any extra costs must be considered.

Pause and explain

A product sells for $14 and bought-in parts cost $5. What is added value per unit?

Put the idea to work

Worked example

A maker buys components for $8 and sells the finished lamp for $21. Calculate added value per lamp and explain why this is not profit.

Show the worked solution
  1. Start with selling price.
  2. Subtract the cost of bought-in components: 21 − 8.
  3. Identify another cost not included in this calculation.

Answer $13 added value per lamp; wages, rent and other costs still affect profit.

Try a topic test

Choose Easy, Normal or Difficult. Save your answers and open worked review after finishing.

Test this topic →

From guided practice to a new situation

Write your answer and reasoning first. Use a hint only if you are stuck. The model solution is for self-checking; your written work is not automatically marked.

1 · Guided

A reusable bottle sells for $12.50 and purchased materials cost $4.20. Calculate added value per bottle.

Give me a hint

Subtract bought-in material cost from selling price.

Compare my reasoning
  1. Write 12.50 − 4.20.
  2. Align decimal places.
  3. Retain the per-bottle unit.

$8.30 per bottle.

Look for these in your work

  • Correct subtraction
  • Currency retained
  • Unit stated
2 · Independent

A business adds gift packaging costing $0.60 and raises the selling price by $1.00. What happens to added value per unit, other costs unchanged?

Give me a hint

Compare the increase in price with the increase in bought-in cost.

Compare my reasoning
  1. Selling price rises by $1.00.
  2. Bought-in packaging cost rises by $0.60.
  3. The difference between the changes is $0.40.

Added value rises by $0.40 per unit, assuming the product still sells at the higher price.

Look for these in your work

  • Both changes considered
  • Net change calculated
  • Sales assumption stated
3 · Transfer

A student says a product with $4 added value must earn $4 profit. Correct the claim with two relevant costs.

Give me a hint

Name costs not subtracted in the added-value calculation.

Compare my reasoning
  1. Added value subtracts only the specified bought-in inputs.
  2. Wages and rent are examples of further costs.
  3. Profit depends on revenue and all relevant costs.

The claim is incorrect: $4 is the amount above bought-in material/component cost. Wages, rent, energy and other costs may reduce profit, so the product could even make a loss.

Look for these in your work

  • Added value defined
  • Further costs named
  • Profit conclusion bounded

Common mistakes

  • Calling added value revenue or profit
  • Subtracting selling price from material cost
  • Ignoring whether a proposed quality improvement adds cost
Recall without your notes

What can you explain now?

How is added value per unit calculated?

Compare with the explanation

Selling price minus bought-in material or component cost

This is the syllabus calculation.

After trying it yourself, choose your next review. This is your self-assessment.

Your review choice appears on Today. Sign in to sync it across devices.

Make it stick

Calculate added value from two figures, then name a cost that prevents it from being profit.

If you needed the solution, close it and solve the problem again from a blank page. A correct answer is stronger when you can explain the reason for each step.

Keep learning Business

Course scope and assessment

Ninety-one original lessons cover all six topics of the Cambridge IGCSE Business 0264 syllabus for exams 2027–2029, mapping all nine Topic 1 sections, all twelve Topic 2 sections, all thirteen Topic 3 sections, all nine Topic 4 sections, all nine Topic 5 sections and all nine Topic 6 sections to guided, independent and transfer practice with explained answers. This A*–G qualification has a separate 9–1 grading route, Cambridge IGCSE (9–1) Business 0774, linked to the same six-topic content in its own subject page. Candidates are not assessed on constructing cash-flow forecasts or financial statements. They are also not assessed on exchange-rate calculations. This is not a claim of Cambridge IGCSE Business Studies 0450 or O Level Business 7081 coverage. Written practice is self-checked; full timed Paper 1 data-response and Paper 2 case-study coverage and human subject-teacher review remain outstanding.

StudyForA · Learn with understanding

Original teaching content and links to official sources. Check your exam year and qualification before using a resource.