Learn in your language
Skip to content
A Level · Cambridge (CIE) · 9706

Compare NPV and test assumptions

Compare projects on a consistent discount basis and examine sensitivity to changed assumptions.

Section 4.4 · Investment appraisal

Cambridge International AS & A Level Accounting 9706 · Topic 4.4 · 2026–2028 · 4.4
Exam scope and assessment notes

Cambridge International AS & A Level Accounting 9706, 2026–2028 syllabus, Version 2. This topic covers future net cash flows, payback, ARR, NPV, IRR and supported investment decisions. Discounted payback and questions involving a residual value at the end of a project are excluded by Cambridge. Practice is self-checked, not an official Cambridge grade. Full timed Papers 1–4 and human subject-teacher review remain outstanding.

Before you begin

  • Use AS Topics 1.5–1.6 for profit, depreciation and financial analysis, and Topic 2.1 for contribution. Keep accounting profit, project cash flow and the time value of money distinct.

Work on paper. Try each question before revealing help, and explain why your method works.

Quick readiness check

A has NPV $11,000 and B $7,000 at the same rate. Which is higher?

What you will learn

  • Compare NPV at the same rate
  • Test sensitivity to forecast changes
  • Explain the limit of a single scenario

Compare like with like

For mutually exclusive projects, use the same rate, time basis and assumptions. A higher positive NPV indicates a larger present-value contribution on that basis, if projects are feasible and comparable.

If lifespan, scale, capacity or risk differ materially, explain those differences. A higher NPV does not make an infeasible project deliverable.

Test assumptions that matter

NPV is sensitive to future cash flows and the discount rate. Recalculate with plausible changes in sales, costs, timing or rate.

Sensitivity analysis shows how a result changes; it does not assign probabilities. Management needs evidence about likelihood and consequences.

Pause and explain

Sales fall in a sensitivity test. What should be recalculated?

Put the idea to work

Worked example

At the same rate, A has NPV $14,000 and B $9,500. A's sales forecast is less certain. What is balanced analysis?

Show the worked solution
  1. A leads by $4,500 on the stated assumptions.
  2. Test A under lower-sales scenarios.
  3. Compare feasibility and risk before recommending.

Answer A leads on the base forecast, but test its less certain sales assumption and compare operational risk.

Try a topic test

Choose Easy, Normal or Difficult. Save your answers and open worked review after finishing.

Test this topic →

From guided practice to a new situation

Write your answer and reasoning first. Use a hint only if you are stuck. The model solution is for self-checking; your written work is not automatically marked.

1 · Guided

A project has base NPV $16,000. A cost rise reduces total PV by $9,000. Find revised NPV.

Give me a hint

Subtract the PV of added costs.

Compare my reasoning
  1. 16,000 − 9,000 = $7,000.
  2. The revised NPV remains positive.
  3. This assumes no other change.

Revised NPV is $7,000 under this scenario.

Look for these in your work

  • Effect direction
  • Value calculated
  • Assumption noted
2 · Independent

P has NPV $20,000 and Q $17,000 at the same rate. P's costs may be understated by $5,000 PV. Compare after adjustment.

Give me a hint

Deduct the possible cost shortfall from P.

Compare my reasoning
  1. P revised NPV = $15,000.
  2. Q remains $17,000 on its estimate.
  3. Q leads by $2,000 in this scenario; investigate the cost estimate.

P's scenario NPV is $15,000; Q's $17,000 is higher by $2,000.

Look for these in your work

  • Adjustment calculated
  • Comparison correct
  • Uncertainty retained
3 · Transfer

A 3-year project and an 8-year project are ranked by total NPV. What should the analyst disclose?

Give me a hint

Different lives and scale may affect total values.

Compare my reasoning
  1. Show each life, rate and investment.
  2. Explain whether projects are mutually exclusive and repeatable.
  3. Consider capacity and risk alongside NPV.

Disclose different lives and decision context; total NPV alone may not settle a choice where lives or scale differ.

Look for these in your work

  • Life disclosed
  • Context checked
  • Limit explained

Common mistakes

  • Comparing NPVs calculated at different rates
  • Ignoring project feasibility
  • Calling a sensitivity scenario a probability
Recall without your notes

What can you explain now?

What is a sound first step when comparing two NPVs?

Compare with the explanation

Use the same discount rate and consistent assumptions

A common basis makes the figures meaningfully comparable.

After trying it yourself, choose your next review. This is your self-assessment.

Your review choice appears on Today. Sign in to sync it across devices.

Make it stick

What does sensitivity analysis reveal, and what does it not reveal?

If you needed the solution, close it and solve the problem again from a blank page. A correct answer is stronger when you can explain the reason for each step.

Keep learning Accounting

Course scope and assessment

197 original lessons teach Topics 1.1–1.6 and 2.1–2.2, plus Topics 3.1–3.5 and 4.1–4.4, with explained, staged practice mapped to the listed syllabus objectives, including all four Topic 1.5 objectives. Topic 3.1 covers partnership changes, clubs and societies, manufacturing accounts and the limited-company statement set. Topic 3.2 covers all nine named IAS at Cambridge's stated main-provisions level, ethical principles, audit and stewardship. Topic 3.3 covers business mergers and acquisitions, goodwill, consideration, ledger entries, post-acquisition statements and evaluation. Topic 3.4 covers controlled accounting-data conversion and integrity checks. Topic 3.5 covers all nine appendix ratios, exact prescribed formulae, interrelationships, limitations and justified stakeholder recommendations. Topic 4.1 covers cost pools, cost drivers, ABC overhead allocation, unit costs, selling prices, comparisons, uses, limitations and business decisions. Topic 4.2 covers standard costing, all listed cost and sales variances, their causes and relationships, budget improvement and non-financial decision factors. Topic 4.3 covers linked master-budget schedules, all nine listed budgets, limiting factors, flexible-budget statements and reconciliations, target behaviour and supported decisions. Topic 4.4 covers future project cash flows, payback, ARR, NPV, IRR, method limits and balanced recommendations; Cambridge excludes discounted payback and residual-value questions. All 17 topics have full mapped sequences. The separately published 2029 syllabus is not covered. Practice is self-checked and does not award Cambridge grades. Full timed Papers 1–4 and human subject-teacher review remain outstanding.

StudyForA · Learn with understanding