Distinguish a budget at one planned activity level from a budget adjusted to actual activity.

Cambridge International AS & A Level Accounting 9706 · Topic 4.3 · 2026–2028 · 4.3

Cambridge International AS & A Level Accounting 9706, 2026–2028 syllabus, Version 2. Topic 4.3 covers budgetary control, linked master-budget schedules, spreadsheets, limiting factors, flexible budgets, reconciliations, behavioural effects and supported decisions. Practice is self-checked, not an official Cambridge grade. Full timed Papers 1–4 and human subject-teacher review remain outstanding.

Before you begin

  • Use AS Topics 2.1–2.2 for cost behaviour, contribution and budgeting foundations. For each schedule, label the period, units, price, inventory policy, timing assumptions and opening balance before calculating.

Work on paper. Try each question before revealing help, and explain why your method works.

Quick readiness check

Within its relevant range, a total variable cost generally…

What you will learn

  • Explain fixed and flexible budgets
  • Explain why flexing improves comparison
  • Classify costs by behaviour for the relevant range

The activity basis matters

A fixed budget is prepared for one planned activity level. A flexible budget adjusts the budgeted amounts for the activity actually achieved, using cost behaviour assumptions, so that actual costs can be compared on a more like-for-like basis.

Variable cost changes with activity in the relevant range; fixed cost stays constant in total over that range; a semi-variable cost includes a base amount and a variable element. State the range and period because costs can change outside those assumptions.

Flexing improves evaluation, not prediction

If actual output differs from plan, comparing actual cost with an unadjusted fixed budget can mix the effect of volume with the effect of control. Flexing shows what costs were expected for the actual activity level.

A flexible budget is only as reliable as its cost classifications and rates. It does not automatically explain a difference, remove inefficiency or capture quality, mix or external changes.

Pause and explain

Fixed overhead is $9,000 in the relevant range. If output rises, how does the total fixed budget usually change?

Put the idea to work

Worked example

Variable cost is $5 per unit and fixed cost is $12,000. Compare fixed-budget cost at 2,000 units with a flexible budget at 2,400 units.

Show the worked solution
  1. Fixed budget at 2,000: variable 2,000 × $5 = $10,000 plus $12,000 = $22,000.
  2. Flex to 2,400: variable 2,400 × $5 = $12,000 plus unchanged fixed $12,000.
  3. Flexible budget total = $24,000.

Answer The fixed-budget total is $22,000; the flexible budget at 2,400 units is $24,000.

Try a topic test

Choose Easy, Normal or Difficult. Save your answers and open worked review after finishing.

Test this topic →

From guided practice to a new situation

Write your answer and reasoning first. Use a hint only if you are stuck. The model solution is for self-checking; your written work is not automatically marked.

1 · Guided

Variable cost is $7/unit; fixed cost $15,000. Flex the budget from 1,800 to actual output of 2,100 units.

Give me a hint

Keep fixed cost constant and recalculate variable cost at actual units.

Compare my reasoning
  1. Variable at 2,100 = 2,100 × $7 = $14,700.
  2. Add fixed $15,000.
  3. Flexible budget total = $29,700.

$29,700 flexible budget at 2,100 units.

Look for these in your work

  • Actual activity used
  • Variable cost flexed
  • Fixed cost retained
2 · Independent

A fixed budget at 3,000 units includes variable cost $4.50/unit and fixed cost $18,000. Actual output is 3,400. Calculate the fixed-budget total and flexible-budget total.

Give me a hint

The fixed budget uses planned units; the flexible budget uses actual units.

Compare my reasoning
  1. Fixed budget: 3,000×4.50 + 18,000 = $31,500.
  2. Flexible budget: 3,400×4.50 + 18,000 = $33,300.
  3. The $1,800 difference is the expected variable-cost effect of 400 more units.

Fixed budget $31,500; flexible budget $33,300.

Look for these in your work

  • Fixed-budget activity correct
  • Flexible activity correct
  • Volume effect interpreted
3 · Transfer

Actual cost exceeds the fixed budget, but output also exceeded plan. Why could a flexible budget change the performance interpretation?

Give me a hint

It adjusts expected variable costs to the actual activity level.

Compare my reasoning
  1. More output normally requires more variable input and cost.
  2. The fixed budget does not reflect that additional activity.
  3. Compare actual cost with the flexible budget to isolate a remaining difference for investigation.

The fixed budget can make extra output look like overspending. Flexing sets the expected cost for actual activity, leaving a more relevant comparison.

Look for these in your work

  • Output change recognised
  • Variable cost flexed
  • Control comparison improved

Common mistakes

  • Changing fixed cost per unit while keeping the total fixed cost constant
  • Comparing actual cost with the original activity budget after output changes
  • Assuming the cost behaviour relationship holds at every output level
Recall without your notes

What can you explain now?

What does a flexible budget adjust for?

Compare with the explanation

The actual activity level

Flexing changes budgeted amounts according to activity and cost behaviour.

After trying it yourself, choose your next review. This is your self-assessment.

Your review choice appears on Today. Sign in to sync it across devices.

Make it stick

State one benefit and one limitation of comparing actual costs with a flexible budget.

If you needed the solution, close it and solve the problem again from a blank page. A correct answer is stronger when you can explain the reason for each step.

Keep learning Accounting

Course scope and assessment

197 original lessons teach Topics 1.1–1.6 and 2.1–2.2, plus Topics 3.1–3.5 and 4.1–4.4, with explained, staged practice mapped to the listed syllabus objectives, including all four Topic 1.5 objectives. Topic 3.1 covers partnership changes, clubs and societies, manufacturing accounts and the limited-company statement set. Topic 3.2 covers all nine named IAS at Cambridge's stated main-provisions level, ethical principles, audit and stewardship. Topic 3.3 covers business mergers and acquisitions, goodwill, consideration, ledger entries, post-acquisition statements and evaluation. Topic 3.4 covers controlled accounting-data conversion and integrity checks. Topic 3.5 covers all nine appendix ratios, exact prescribed formulae, interrelationships, limitations and justified stakeholder recommendations. Topic 4.1 covers cost pools, cost drivers, ABC overhead allocation, unit costs, selling prices, comparisons, uses, limitations and business decisions. Topic 4.2 covers standard costing, all listed cost and sales variances, their causes and relationships, budget improvement and non-financial decision factors. Topic 4.3 covers linked master-budget schedules, all nine listed budgets, limiting factors, flexible-budget statements and reconciliations, target behaviour and supported decisions. Topic 4.4 covers future project cash flows, payback, ARR, NPV, IRR, method limits and balanced recommendations; Cambridge excludes discounted payback and residual-value questions. All 17 topics have full mapped sequences. The separately published 2029 syllabus is not covered. Practice is self-checked and does not award Cambridge grades. Full timed Papers 1–4 and human subject-teacher review remain outstanding.